Trockenbau geht weiter
The drywall continues. On Wednesday then the heat pump will be delivered. Then we heat at last. Since we still have no water meter, I called again at the DREWAG. It still lacks a protocol SSS. Mr. citizens will fax it tomorrow. For this we need the heat pump water meter!
0 comments:
Post a Comment